Process, Craftsmanship & Results
From surface survey to final protection coat — a look inside the Aquaseal waterproofing system, and the projects it has protected.
The Aquaseal Waterproofing Process
Every project follows the same disciplined, standards-based application system.

Seepage & Leakage Survey
Any leakages or seepage from washrooms, ducts, kitchen sinks, balcony gardens, AC vents, damaged concealed plumbing, slab-wall joints, or improper slopes on terraces leading to water logging are attended to by experts before painting begins. Proper slopes on balconies, terraces, parapets and window tops are maintained so rain and other water drains out efficiently.

Surface Cleaning
The surface is washed with clean, soft water followed by a wire/coir brush and metal scrapers to remove loose, peeling paint, chalking, algae, fungus, moss, grease, dirt, dust, bird droppings and accumulated soil from balcony gardens.

Crack Filling
Bigger cracks (over 3mm) are widened in a V-shape and filled with an appropriate cement-based crack filling mixture, or a suitable range of crack fillers, followed by re-plastering, hole filling, levelling and structural repair where needed.

Holes, Dents & Levelling
Holes, dents and mould marks are filled with a white or black cement fine-sand paste, or an exterior cement-based poly putty. The surface is carefully levelled to remove any major (over 3mm) holes and dents, giving a finished, level appearance.

Waterproofing Basecoat
One coat of waterproof basecoat is applied with a brush or roller, with zero dilution, and left to dry for a minimum of 6–8 hours before the first coat is applied.

1st & 2nd Coat Application
The first and second coats are applied with a brush or roller, thinned 30–40%, with a minimum drying time of 4–6 hours between coats for a durable, even finish.

Special Protection Coat
For added assurance, Aquaseal recommends a special transparent protection coat over the finished waterproofing system for extra durability against leakage.

Terrace Waterproofing & Surface Preparation
Proper cleaning (no dust, grease, algae, dried or flaked paint), washing, and repair of loose plaster and structural cracks as per standard construction practice. Gaps between chips are filled with suitable crack fillers, an initial priming coat is applied, and undiluted waterproofing coats follow — all per Aquaseal’s application system.
Podium Waterproofing
Our podium waterproofing system is built layer by layer, from the concrete slab up to the finished paving, for a durable, leak-resistant deck that stands up to years of foot traffic and weather.


Terrace Waterproofing
Terraces face the harshest exposure of any surface — sun, rain and standing water. Our terrace waterproofing system combines proper surface preparation, crack repair, priming and multiple undiluted waterproofing coats to deliver long-term protection, finished per Aquaseal’s company application system.

After Coating
Before & After
A closer look at the transformation our waterproofing process delivers on site.
PU Foam Injection Grout

Nashik Corporation
Nashik, Maharashtra

Nandan Inspira Housing Society
Pune, Maharashtra
Our Esteemed Clients